Investor : U. S. Steel Košice, s.r.o.

2018 Emission control for Rudné mosty VP1
2019 Emission control for Rudné mosty VP2
2018 Ammonia deaerator – part of the replacement of the desulphurisation boiler
2018 Dedusting of the Agglomeration of belts No.1- 4 2019 RaM of Dynamolines – Dynamoline No.4 2019 Replacement of HV cables between substations T124 -T11 -T12 -T34 2018 Dedusting of Agglomeration Belts
2018 Dismantling of Dynamolines No.1 and No.2
2019 Removal of damaged ELI on the new part of ML1
2020 Reconstruction of Wind Heater No.24 at VP2
2020 Reconstruction of the backup branch of the HV connection for the desulphurisation of the KP
2020 Modernisation of the vacuum station
2021 Replacement of the lighting at the PZ3 plant
2021 Lighting of the engine hall of the TSF
2022 Modernisation of the control system of the Preparatory Order
2022 Modernisation of the 5ST
2022 Overhaul of the guide car No.1 at the VKB No.1 plant
2024 ‘Reconstruction of the Central Substation’
2022-2024 Replacement of the HV 6KV switchgear of the CPR and the Rudisko switchgear.

Railways of the Czech and Slovak Republic

2019 Replacement of insulators on the overhead line
2021 Change of the traction system to AC25 kV, 50Hz in the section Nedakonice-Říkovice; Electrification of the line including PEÚ Brno – Zastávka u Brna I.phase Brno – Střelnice (incl.); Reconstruction of the overhead line in the section Albrechtice u ČT – Havířov (col.no.1) ); Praha – Vršovice; Žleb 2021 Velím – Pořičany, BC
2021 Electrification and capacity increase of the line Šumperk – Libina (outside)
2021 Electrification of the line Haniska -Veľká Ida – Moldava town
2022 ŽST Nové zámky ŽST Palárikovo Reconstruction of track 1,2
2022 Replacement of risky components of TV OR Zvolen
2023 ŽST Krompachy, Reconstruction of switches (OV)

TEKO

2019 Construction of technology for high-efficiency combined production of electricity and heat

MONDI SCP, a.s. Ružomberok

2019 Drying machine – Elektročasť Eustream, a.s.
2013-2014 DLE upgrade of PGT25 KS01 , KS03 , KS04
2020-2022 KS01 – Construction of the interconnecting VTL gas pipeline Poland – Slovakia
2023 ‘Automation and connection of the service water pumping station to the SCS at KS01 Veľké Kapušany’”

Zvolenská teplárenská a.s.

2020 Zvolenská teplárenská a.s. – Modernisation of heating plant ‘A’ – Electrical installation works HV part

CARMEUSE Slovakia s.r.o.

2021-2022 New PFR Kilns
Raw material storage tanks, Extension of raw material unloading and sorting plant
LV part electrical and control system
Light and socket installation for New KL5-KL7 kilns
Lightning conductor for KL5-KL7 kilns and Lightning conductor for fuel management

EUROCAST Košice

2023 HV substation R1 plant Foundry No.2

GRONBACH k.s

2021 Reconstruction of transformer station

Slovnaft

2015 LDPE-4

Renewable energy sources

2009 FVE Ipeľka 0,96MWp
2010 FVE Dóra 0,96 MWp
2010 FVE Buzitka 0,98 MWp
2010 FVE Krásna 0,98 MWp
2010 FVE Lovinobaňa 0,98MWp
2011 FVE Nový Sad 3, 9 MWp
2013 FVZ New Airport Terminal Košice 100 KWp
2013 FVZ ‘29,75 kWp -Airport-HTS Assembly Works
2013 FVZ ’29,75 KWp Airport Felbelmayr-Assembly Works
2024 FVLZ Airport Košice Roder 1. 54 kWp
2010-2024 Service and maintenance of Renewables Dóra PV plant , Krásna PV plant , Buzitka PV plant and Ipeľka PV plant